TITLE: GCN CIRCULAR NUMBER: 29647 SUBJECT: INTEGRAL SPI-ACS on 2021-03-12 (04)11-08:15) are due to calibration activity DATE: 21/03/12 08:42:05 GMT FROM: Carlo Ferrigno at IAAT/ISDC C. Ferrigno (ISDC/UniGE, Switzerland) The INTEGRAL SPI-ACS undergoes a calibration phase each six month approximately. Due to technical issues, the alert monitor was not switched off on 2021-03-12 from 4 to 8:20 UT. As a consequence, the series of alerts in this time frame are of instrumental origin. We apologize for the disturbance this might have caused.