TITLE: GCN CIRCULAR NUMBER: 26721 SUBJECT: LIGO/Virgo S200112r: INTEGRAL was inactive at the time of the event DATE: 20/01/12 18:09:26 GMT FROM: Alexis Coleiro at APC/U. Paris Diderot Alexis Coleiro (APC, France), Carlo Ferrigno (ISDC/UniGE, Switzerland), V. Savchenko (ISDC/UniGE, Switzerland), S. Mereghetti (INAF IASF-Milano, Italy), J. Rodi (IAPS-Roma, Italy) on behalf of the INTEGRAL multi-messenger collaboration: https://www.astro.unige.ch/cdci/integral-multimessenger-collaboration The INTEGRAL spacecraft has a highly elliptical orbit and the instruments are not acquiring science data during perigee passage, every 2.6 days to prevent radiation-induced damages. Unfortunately, at the time of the S200112r (2020-01-12 15:58:38) the spacecraft was preparing to the start the observations after the perigee passage between the orbits number 2182 and 2183 and no scientific instrument data are available between 2020-01-12T08:15:40 and 2020-01-12T18:14:13.