TITLE: GCN CIRCULAR NUMBER: 32629 SUBJECT: GRB 220915A: Detection by GRBAlpha DATE: 22/10/07 19:56:55 GMT FROM: Jakub Ripa at Masaryk University <245487@mail.muni.cz> M. Dafcikova, J. Ripa (Masaryk U.), A. Pal (Konkoly Observatory), N. Werner (Masaryk U.), M. Ohno, H. Takahashi (Hiroshima U.), L. Meszaros, B. Csak (Konkoly Observatory), N. Husarikova, J.-P. Breuer, F. Munz , M. Topinka, F. Hroch (Masaryk U.), T. Urbanec, M. Kasal,  A. Povalac (Brno U. of Technology), J. Hudec, J. Kapus, M. Frajt (Spacemanic s.r.o), R. Laszlo, M. Koleda (Needronix s.r.o), M. Smelko, P. Hanak, P. Lipovsky (Technical U. of Kosice), G. Galgoczi (Wigner Research Center/Eotvos U.), Y. Uchida, H. Poon, H. Matake (Hiroshima U.), N. Uchida (ISAS/JAXA), T. Bozoki (Eotvos U.), G. Dalya (Eotvos U.), T. Enoto (Kyoto U.), Zs. Frei (Eotvos U.), G. Friss (Eotvos U.), Y. Fukazawa, K. Hirose (Hiroshima U.), S. Hisadomi (Nagoya U.), Y. Ichinohe (Rikkyo U.), K. Kapas (Eotvos U.), L. L. Kiss (Konkoly Observatory),  T. Mizuno (Hiroshima U.), K. Nakazawa (Nagoya U.), H. Odaka (Univ of Tokyo), J. Takatsy (Eotvos U.), K. Torigoe (Hiroshima U.), N. Kogiso, M. Yoneyama (Osaka Metropolitan U.), M. Moritaki (U. Tokyo), T. Kano (U. Michigan) -- the GRBAlpha collaboration. The long-duration GRB 220915A (Fermi-GBM detection trigger 684911625; Konus-Wind detection at 2022-09-15 05:13:46.2 UT; INTEGRAL/SPI-ACS detection at 2022-09-15 05:13:43 UT) was detected by the GRBAlpha 1U CubeSat (Pal et al. Proc. SPIE 2020). The 8.4 sigma detection was confirmed at the peak time 2022-09-15 05:13:42.9 UTC. The GRB has the T90 duration of 12 s. The light curve obtained by GRBAlpha is available here: https://grbalpha.konkoly.hu/static/share/GRB220915A_GCN.pdf GRBAlpha is a demonstration mission for a future CubeSats constellation (Werner et al. Proc. SPIE 2018). The detector of GRBAlpha consists of a 75 x 75 x 5 mm3 CsI scintillator read out by a SiPM array, covering the energy range from ~50 keV to ~1000 keV. GRBAlpha was launched on 2021 March 22 from Baikonur. After its commissioning phase, the scientific observations are now under way. To increase the duty cycle and the downlink rate, the upgrade of the on-board data acquisition software stack is in progress. The ground segment is also supported by the radio amateur community and it takes advantage of the SatNOGS network for increased data downlink volume.