TITLE: GCN CIRCULAR NUMBER: 12273 SUBJECT: Reprocessed enhanced Swift-XRT positions and GRB products: update DATE: 11/08/11 13:35:11 GMT FROM: Phil Evans at U of Leicester P.A. Evans & J.P. Osborne (U. Leicester) report, Following the revision to the enhanced XRT GRB positions (GCN 12250), those for GRBs between 2005 July and 2006 April only were found to be have been degraded in the Aug 5 reprocessing. This was due to the use of an inappropriate alignment calibration file in the standard pipeline processing for this interval. We have now recalculated the positions with the correct files, see http://www.swift.ac.uk/reprocessed.php for details. We thank Daniele Malesani for alerting us and providing additional optical positions to enable improved calibration and testing.