TITLE: GCN CIRCULAR NUMBER: 15863 SUBJECT: Swift follow-up of an Integral weak transient DATE: 14/02/20 11:48:31 GMT FROM: Rhaana Starling at U of Leicester R. Starling (U. Leicester) reports: We observed the position of the Integral weak transient #6467 with Swift on 19th February 2014 starting at 18:37 UT, 2.5 hours after the Integral trigger. We do not detect any source in the XRT field of view in a 2.98 ks observation. The 3-sigma upper limit on the 0.3-10 keV count rate at the Integral position (RA, Dec: 204.097, -45.0619 deg) is 0.003 count/s. We thank the Swift team for carrying out this rapid ToO.